
TD021000-0MB
15
5.1.4
Connecting to the Configuring Device
If advanced operation is to be implemented, the Console port
must be connected via a null-modem cable to a machine that is
capable of configuring or monitoring the EISC.
5.1.5 Connecting to the Fault Relay
In advanced operation, the Fault Relay is available for use. To
monitor the Fault Relay, connect a supervisory machine to the
EISC via its two Fault Relay terminals.
Figure 9 — The
Console Port &
Fault Relay
Connector
Comentários a estes Manuais